Floor preparation, supply only and installation

From preparation to installation, we've got you covered.

Floor preparation

Ite and Mapei systems.

  1. L02

    Diamond grinding

    We grind or sand the concrete back to a clean, sound surface. Laitance, old adhesive and coatings come off so the next layer bonds.

    Ground and cleaned

  2. L03

    Moisture barrier

    Concrete holds moisture long after it looks dry. We test the slab and put down a moisture barrier where it's needed, so the finish doesn't lift or bubble.

    Moisture tested

  3. L04

    Self-levelling screed

    An Ite or Mapei self-levelling screed gives a flat, smooth base. Vinyl sheeting and luxury vinyl tiles show every dip in the floor below them.

    Levelled

An empty office with the old floor lifted: a bare, patchy concrete slab with adhesive marks.
Before. The old floor lifted and the slab being prepared.
The same office from the same spot with a new light grey floor laid wall to wall.
After. The new floor down, same room.

Supply and installation

Multiple finishes. Brand and range come with the quote.

Also

Work alongside the floor.

  • Wall protectionHand rails, bumper rails, wall guards, corner guards (PVC and heavy duty) and door protection sheets.
  • Cleaning and maintenanceCleaning, sealing and maintaining vinyl floors.

How you can buy it

  • Supply onlyThe finish, from our suppliers' ranges.
  • Supply and installThe finish, laid by us, with the 12-month workmanship guarantee.
  • Floor preparation onlyGrinding, moisture barrier and screed, ready for the finish.
  • Service onlyCleaning, sealing or maintaining a vinyl floor that's already down.

Sectors

Send us the scope.

Tell us the floor, the area and where the site is.

Get a quoteWhatsApp